How to Compare Builder Quotes for an Extension or Loft Conversion

Two builder quotes for the same extension or loft conversion can differ by thousands of pounds, and the cheaper one is often the one that leaves something out. The fix is to compare the scope first and the total second.
The short answer
- Get at least three written quotes. The Federation of Master Builders recommends detailed written quotes from at least three builders.
- Give every builder the same brief: the same drawings, specification and exclusions list.
- Line up the scope before the price. Check VAT, provisional sums, fit-out, fees, waste removal and making good.
- Treat the cheapest quote with care. Which? Trusted Traders says the cheapest is not automatically the best, and the FMB lists pressure to decide immediately and cash-to-avoid-VAT offers as red flags.
What a good quote should include
The FMB says a written quote should be detailed enough for you to understand what you are paying for. In practice, look for:
- The full scope of work, with labour and materials, and whether VAT is included.
- Fixtures and finishes included, and anything specifically excluded.
- Any allowances or provisional costs, waste removal and who is responsible for specialist trades.
- An expected start date, duration and payment stages.
- How changed work will be priced and communicated.
- Scaffolding, waste disposal and making good, which Which? says should be covered.
A quote comparison grid
Copy this into a spreadsheet and fill one column per builder. A blank cell is a question to ask.
| Check | Builder A | Builder B | Builder C |
|---|---|---|---|
| Quote based on the same drawings and specification? | |||
| Total price, and is VAT included? | |||
| Provisional sums or allowances (list them) | |||
| Kitchen, bathroom, flooring and decoration included? | |||
| Structural engineer, Building Control and party wall costs included? | |||
| Scaffolding, skips and making good included? | |||
| Start date, duration and payment stages | |||
| Insurance, and an insurance-backed guarantee offered? | |||
| References from similar projects offered? |
Why provisional sums matter: a provisional sum is a placeholder for something not yet priced. A quote with several low placeholders can look cheaper than one that has priced the same items properly, and the difference arrives later as an extra.

Payments, contracts and protection
- Written contract: the FMB advises having one before building work starts, covering scope, price, variations, dates, payments, insurance, defects and snagging. It offers plain-English templates, and the JCT Building Contract for a Home Owner/Occupier may suit some projects.
- Deposit and stage payments: the FMB says around 10% is often used as a guide for a deposit, with larger projects paid in agreed stages. Check each stage is complete before paying, and get receipts.
- Retention: the FMB says retention is often around 2.5% to 5%, with the amount and release point agreed in the contract. Which? Trusted Traders previously quoted FMB guidance of 2.5% for a three to six month snagging period.
- Payment method: pay by a traceable method and keep invoices. Avoid cash.
- Insurance: ask to see public liability insurance that covers the work at your property, and ask what warranty or insurance-backed guarantee applies if the builder cannot return to fix a defect.
Red flags
- No detailed written quote.
- Pressure to decide immediately.
- A request to pay cash to avoid VAT.
- A guarantee of no unexpected costs where genuine uncertainties remain, such as unseen ground or structure.
- Refusing a written contract, avoiding references or showing no evidence of insurance.
- An unusually large upfront payment without a clear reason.
Membership of a trade body is useful but is not a guarantee. Which? Trusted Traders advises weighing experience and reviews alongside it, and checking the quality of the survey a builder carries out before pricing.
How to compare the quotes you receive
- Fix the brief.Agree drawings and specification first. Our guides to extension costs and loft conversion costs show what typically sits outside a builder’s price.
- Visit and survey.Ask each builder to visit the site before quoting.
- Fill in the grid.Chase every blank cell.
- Adjust for scope.Add the cost of any missing items to the cheaper quote before comparing totals.
- Check references and insurancebefore you decide.
Questions to ask every builder
- Who will be on site day to day, and are they directly employed or subcontracted?
- What is excluded from this price?
- How are variations priced and agreed?
- What happens if you find something unexpected once work starts?
- What guarantee do I get, and what if you cannot return to fix a defect?
- Can I speak to a recent client with a similar project?
Comparing builders in Elmbridge?
Local rules change what a sound proposal should include. Our builders in Elmbridge guide covers conservation areas, Green Belt, flood zones and covenants, with town pages for Cobham, Esher, Weybridge and Oxshott. Once you have quotes, see house extension costs in Surrey and loft conversion costs in Surrey for what drives the numbers.
Frequently asked questions
How many builder quotes should I get?
The Federation of Master Builders recommends detailed written quotes from at least three builders. Give each the same drawings, specification and brief so the quotes can be compared like for like.
What should a builder quote include?
The full scope of work, labour and materials, VAT where applicable, fixtures and finishes included, anything excluded, provisional costs, waste removal, start date, duration, payment stages and how changes will be priced.
Is the cheapest builder quote the best?
Not automatically. Which? Trusted Traders says the cheapest quote is not necessarily the best, so check what the price includes, review references and consider the quality of the survey the builder carried out.
How much deposit should I pay a builder?
The FMB says around 10% is often used as a guide, but the right amount depends on the project. Get a receipt, agree stage payments in the contract, and pay by a traceable method.
What is retention on a building contract?
Retention is a percentage of the contract price held back until snagging is complete. The FMB says retention is often around 2.5% to 5%, with the amount and release point agreed in the contract.
What are the warning signs when choosing a builder?
No detailed written quote, pressure to decide immediately, requests to pay cash to avoid VAT, guarantees of no unexpected costs, refusing a written contract, avoiding references or showing no evidence of insurance.
Related guides
Comparing builders for your project?
Surrey Construction Group has been building across Surrey and London since 2009, with directly employed tradespeople and fixed scope proposals. We are members of the Federation of Master Builders and hold CHAS Elite and SafeContractor accreditations. See our residential construction service or read about the company.
We are one of the builders you may be comparing, so use the checklist above on our proposal too. We can talk through your plans and how the build would run. We work across Elmbridge, with local pages for Cobham, Esher, Weybridge and Oxshott.
Talk to us about your project